Loaf ‘N Jug fuel & convenience-store location
This commercial paving project involved resurfacing a substantial parking and vehicle-circulation area serving the Loaf ‘N Jug location along Highway 160 in Alamosa, Colorado. The property experiences regular automobile traffic as well as heavier delivery and commercial vehicles, making surface durability, consistent compaction, and smooth transitions especially important.
The All Purpose Paving crew placed the asphalt using commercial paving equipment, followed by systematic rolling and targeted plate compaction around curved edges, concrete transitions, and other areas that required detailed finish work. Traffic cones and controlled work zones helped separate active construction areas from the surrounding property while the paving progressed.
The completed surface provides the property with a clean, uniform appearance and a smoother driving area while supporting the demands of a busy commercial fuel and convenience-store location.
Services Include:
Ready to improve your pavement? Contact All Purpose Paving today for a free estimate.
- Commercial asphalt placement
- Machine paving across a large vehicle area
- Asphalt rolling and compaction
- Plate compaction along edges and transitions
- Detailed paving around curved boundaries
- Tie-ins to existing concrete surfaces
- Work-zone and traffic-control setup
- Finish work around an operating commercial property
Emergency Construction Services
Click to Call
(205) 888-0258
Yes, we offer free estimates for all potential projects. Contact us to schedule a consultation.
Residential Asphalt, Concrete, Sealcoat, & Paving FAQs
All Purpose Paving completed commercial asphalt paving across a large parking and vehicle-circulation area serving the property. The work visible in the project photos included machine paving, asphalt rolling, edge compaction, and detailed finishing around existing concrete surfaces.
Proper compaction helps create a dense, stable asphalt surface capable of handling regular customer traffic, delivery vehicles, and changing Colorado weather conditions. Rolling and targeted edge compaction also help produce consistent transitions and a cleaner finished surface.
Yes. This project required detailed asphalt placement and compaction around curved boundaries and existing concrete areas. These transitions require careful finish work to create a smooth, functional connection between surfaces.
Yes. The 102 Highway 160 East project demonstrates All Purpose Paving’s ability to complete substantial commercial asphalt areas using professional paving, rolling, and compaction equipment.
In some cases, paving can be completed in planned sections while preserving limited access to the property. The appropriate traffic-control and staging plan depends on the property layout, project scope, asphalt curing requirements, and safety considerations.
The schedule depends on the size of the paved area, required preparation, weather, site access, asphalt availability, and the complexity of the property. All Purpose Paving evaluates these factors before providing a project timeline.